Author Topic: Road works in Marple  (Read 1955 times)

0 Members and 1 Guest are viewing this topic.

andrewbowden

  • Hero Member
  • *****
  • Posts: 766
Re: Road works in Marple
« Reply #4 on: July 10, 2019, 10:25:06 PM »
It does if you amend the parameters in the box at the top right of the page

Ah, thanks!  I (obviously) missed that.

Snowball

  • Jr. Member
  • **
  • Posts: 53
Re: Road works in Marple
« Reply #3 on: July 10, 2019, 10:20:28 PM »


There's also a handy website https://www.roadworks.org/ that shows current roadworks.  But not (as far as I can tell) roadworks coming up.

It does if you amend the parameters in the box at the top right of the page

andrewbowden

  • Hero Member
  • *****
  • Posts: 766
Re: Road works in Marple
« Reply #2 on: July 10, 2019, 03:55:43 PM »
Work is anticipated to commence 18th July 2019 taking up to 2 weeks to complete, between 19:00hrs to 05:00hrs, weather permitting.To minimise disruption and allow safe working operations to take place it will be necessary to restrict traffic movements using temporary traffic signals and associated road closures on adjoining roads during working hours.
https://assets.ctfassets.net/ii3xdrqc6nfw/5fv6q24PVfYBCtldoLdsse/fc1b81497322ada43ce9339f213a7469/HIP_carriageway_works_-_update_July_2019.pdf

From the Stockport Council website
https://www.stockport.gov.uk/roadworks-closures-diversions/roadworks

There's also a handy website https://www.roadworks.org/ that shows current roadworks.  But not (as far as I can tell) roadworks coming up.

Barbara

  • Guest
Road works in Marple
« Reply #1 on: July 10, 2019, 03:09:37 PM »
Does anybody know the extent/duration of the road works about to begin in Marple on Stockport Road.